12.0204 Connections.
Print This
All final connections, permanent or temporary, between thc utility’s lines and the customer’s wiring will bc made by the utility, and it will not permit or tolerate unauthorized connections.
History: Rule 4-80, eff 1 Apr 80, Final Connections.